Scheduler
Gantt
Project schedules with a Data Grid task pane and a timeline chart, auto scheduling on working calendars, dependencies with lag, critical path, baselines, milestones, split tasks, resources, taskbar editing, undo, export and the GanttApi.
import { Gantt } from '@salmonui/gantt';
import '@salmonui/gantt/styles.css';
<Gantt
data={tasks}
taskFields={{ parentId: 'parentId' }}
timeZone="Europe/Berlin"
height={520}
toolbar={['add', 'edit', 'delete', 'zoomIn', 'zoomOut', 'zoomToFit', 'criticalPath', 'undo', 'redo']}
undo
onDataChange={(rows) => setTasks(rows)}
/>;
@salmonui/gantt/styles.css carries the rules of everything the Gantt
renders (the Data Grid pane, the Splitter, the task editor's Dialog and
DatePicker, and the menus), so it is the only stylesheet besides
@salmonui/core/styles.css; only the lazy taskbar tooltip needs
@salmonui/overlays/tooltip/styles.css (Tooltips).
Composition and state model
The left pane is DataGrid in tree mode, composed only through the public
Data Grid extension points (api.getVisibleRows(), api.getViewport(),
api.subscribeViewport(), api.scrollTo() and api.getRowOffsets()), so
sorting, filtering, search, selection, column menu, reorder, resize, pinning,
hiding, templates, grid lines, tree expansion, row drag and the empty view keep
their Data Grid names, events and budgets. Pass those props to Gantt
unchanged. The chart pane draws exactly the rows of the grid's visible row
model in the grid's rendered window: a grid scroll moves the chart rows with one
transform write, and the vertical wheel over the chart scrolls the grid. The
chart timeline follows the grid header's height (a filter bar makes it taller)
and chart rows follow the grid's horizontal gridLines. treeFilterMode
('ancestors', 'descendants', 'both', 'none', the Data Grid
tree.filterMode) picks the rows a filter or search keeps around the matches.
A row drag drop (rowDrag) and api.moveRows(ids, { targetRowId, position })
move the tasks through the engine, which reschedules them. data can also be a
Data Grid source (createControlledDataSource) or use lazy children
(hasChildrenField, loadChildren): the rows the grid loads join the
schedule and the chart. A new array is applied in place, but an array and a
source are different data modes: give the Gantt a new key to switch
between them.
Remote data and writes
A source with write (createControlledDataSource({ onQueryChange, onDataChange }) or any @salmonui/data source) receives every committed
change, from the taskbar, the dialog, a grid edit or the API, as one Data Grid
WriteRequest through the grid's data source: changed rows carry the
computed dates (start, end, duration, progress as Date instants and
numbers) and the row's own parent field, added and deleted the inserted
and removed tasks, mode: 'batch', and a signal. The rows the change
touched, the task and the dependents it rescheduled, are pending
(data-pending on their chart rows) until the write settles; on success the
grid pane shows the written rows. A newer change of the same task aborts the
older request (its tasks join the newer one) and unmounting aborts every
write in flight. A rejected Promise or a status: 'rejected' result reverts
the change in both panes and calls onError({ error, action, taskIds }).
Until a task is written the grid pane shows the source's own fields (a task
scheduled from its predecessors has no end there yet); the chart shows the
computed schedule.
const source = createControlledDataSource({
onQueryChange: (request) => api.readTasks(request),
onDataChange: (request) => api.saveTasks(request, { signal: request.signal }),
});
<Gantt data={source} taskFields={{ parentId: 'parentId' }} timeZone="UTC" onError={(e) => toast(String(e.error))} />;
Loading placeholders
loadingIndicator: 'skeleton' (the Data Grid prop) shows
the grid's skeleton rows while the source loads, after api.refresh() and
under api.setLoading(true); the chart pane shows the same skeleton rows at
the same height. Under a lazy parent whose children load, the grid opens a
skeleton row (virtualization.skeletonRows, default on) and the chart opens the same gap with a shimmer bar
under the parent's bar, so both panes stay aligned; virtualization: { skeletonRows: false } turns both off. The default 'spinner' covers the
grid pane only. The placeholders are client-only and add no CSS.
Gantt follows the Data Grid model: options props (data, workingTime,
criticalPath, zoom, timeline, ...) are re-applied when they change; user
actions fire before and after events that cancel with preventDefault()
(onBeforeTaskChange / onTaskChange, onBeforeDependencyChange /
onDependencyChange, onBeforeTaskbarEditEnd / onTaskbarEditEnd,
onBeforeDialogOpen, onBeforeExport / onExport); ref receives the
GanttApi, which extends the grid pane's DataGridApi. onDataChange(rows)
gives the changed data in the shape you passed (nested or flat); passing that
array back as data is not a reload.
Gantt remote data
Open demoTasks from a controlled data source with skeleton rows while the first read is slow, writes that apply or are rejected and reverted, a local array that is replaced through the data prop and whose wave loads its children on expand, onViewChange and the loading spinner.
- Loading from the server…
Tasks and fields
data holds nested rows (children) or flat rows with a parent id.
taskFields maps the roles to your property names: id, title, start,
end, duration, durationUnit, progress, parentId, children,
predecessors, milestone, notes, baselineStart, baselineEnd,
baselineDuration, resources, work, taskType, manual, segments,
indicators, expanded, constraintType, constraintDate, calendar and
className. Dates are Dates, ISO strings, epoch ms or plain
{ year, month, day, hour, minute } objects, read as wall times in
timeZone. Set timeZone for server rendering.
Scheduling
The project engine derives the missing value of start, end and duration on
working time (autoSchedule, default true). workingTime sets the day
ranges, per-weekday ranges, work days, includeWeekend, hoursPerDay,
daysPerWeek and daysPerMonth; holidays are non-working and shaded;
calendars with projectCalendar and the task calendar role give named
calendars with exceptions. taskMode is 'auto', 'manual' or 'custom'
(per task manual); manual parents keep their dates and show the rolled-up
range. Parents roll up dates and duration-weighted progress. taskType
('fixedUnit', 'fixedWork', 'fixedDuration') and workUnit drive the
work math; api.formatWork(id) and api.formatDuration(id) format them.
Constraints are the eight Project types with constraintDate;
unscheduledTasks renders tasks without dates as placeholders.
Dependencies use the string form ('2FS+3d,3SS-2h') or
{ id, type: 'fs' | 'ss' | 'ff' | 'sf', lag, lagUnit }[].
dependencyTypes limits the types, parentDependencies allows links on
parents, validateManualTasks validates manual successors and
dependencyLag normalizes lags on load or on taskbar edits. With
validateDependencies (default) a user edit that breaks a link opens the
conflict dialog (keep the link and move the task, remove the link, or cancel),
or calls onScheduleConflict(event) with event.resolve(choice).
criticalPath marks critical bars and connectors (data-critical);
api.getCriticalTasks() and the total float in api.getTaskInfo(id) come from
a forward and backward pass. wbs adds the 'wbs' and 'wbsPredecessors'
column presets. projectStart / projectEnd and api.setProjectDates() set
the project range.
Gantt scheduling and dependencies
Open demoA warehouse fit-out on mapped fields with finish-to-start, start-to-start and finish-to-finish links with lags, the critical path and total float, auto and manual task modes, a constraint, an unscheduled task, the conflict dialog, project dates, durations, WBS codes and serial numbers.
- Drag a task before its predecessor or press a button
Gantt calendars and working time
Open demoOffice hours with a lunch break and a short Friday, Christmas and New Year holidays, shaded weekends, a night-shift and a seven-day calendar per task, a time zone switch, an hour-based duration and work, units and task types.
Change a resource unit or the work of Commissioning to see the task type at work
Columns
columns takes Data Grid columns and the task presets 'title', 'start',
'end', 'duration', 'progress', 'predecessors', 'resources',
'work', 'taskType', 'notes', 'baselineStart', 'baselineEnd',
'wbs', 'wbsPredecessors', 'serialNumber' and 'id'. Durations are
edited as text ('3 days', '2h', localized through localeText),
predecessors in the string form. dateFormat sets the date format: Intl
options or a skeleton ('yMMMd') or style ('short') format the columns,
labels and tooltips; a pattern ('dd.MM.yyyy') formats the columns.
treeColumn picks the expander column.
Gantt task pane features
Open demoThe Gantt task pane with the Data Grid's sorting, filtering, search, multi-row selection, column menu, reorder, resize, a pinned ID column, a column chooser with a hidden column, a cell template and row props, grid lines and hover, tree expansion, a switchable tree column, row drag and an empty view.
- Sort, filter, search or drag a row
Timeline
timeline.mode ('hour', 'day', 'week', 'month', 'year') picks a
tier preset; topTier / bottomTier (unit, count, format, render),
unitWidth, weekStart and renderCell refine it. zoom / onZoomChange
index zoomLevels (built-in levels from half-years to five minutes);
api.zoomIn(), api.zoomOut(), api.zoomToFit(), Ctrl+wheel and the
toolbar items change it. Tier cells, shading, markers and connectors are
virtualized horizontally (taskbars are bounded by the row window); timeline.infinite and api.extendTimeline() extend the range.
highlightWeekends, holidays and markers shade and mark dates.
Gantt timeline and zoom
Open demoHour to year timeline modes and custom month-over-fortnight tiers with a cell template, unit width and Monday week start, zoom in and out, zoom to fit, an infinite timeline, scroll to a date or task, event markers, the splitter and panes, and a pattern date format.
Zoom with Ctrl+wheel over the chart, or drag the splitter
Chart
Taskbars show progress, summary bars, milestones (diamonds), baselines
(baselines), split segments, indicators (the indicators role), labels
(labels.start, labels.end, labels.inside) and connectors with arrows.
rowHeight, getRowHeight and taskbarHeight size them; the grid and the
chart share one row metric. renderTaskbar, renderParentTaskbar,
renderMilestone and renderBaseline replace parts; getTaskbarProps(ctx)
adds classes, styles and data-* attributes per task. Parts are
.salmon-gantt__taskbar, __progress, __summary, __milestone,
__baseline, __segment, __connector, __marker and __holiday, with
data-critical, data-manual, data-selected and data-parent.
onTaskbarClick reports clicks on bars (a click also selects the row),
onRowDoubleClick double clicks on grid rows, and onChartPointerMove the
date and task under the pointer, at most once per animation frame.
Gantt baselines, labels and templates
Open demoA conference plan with planned baselines and a baseline template, owner and progress labels, an indicator, taskbar, baseline and connector tooltips, custom taskbar, parent and milestone templates, per-task taskbar props, row and taskbar heights and root class and style.
Hover a taskbar, a baseline or a connector
Editing
editing (default on unless readOnly): mode 'auto' edits cells in the
grid and opens the dialog from the chart, 'dialog' always uses the dialog.
Taskbars move, resize from either end and change progress by dragging, snapped
to the bottom tier unit (days on week and month scales); dragging from a
connector point to another taskbar adds a dependency. Every pointer move only
writes the bar's style; the engine runs once at the end. onTaskbarEditStart,
onTaskbarEdit (once per frame), onBeforeTaskbarEditEnd and
onTaskbarEditEnd report the edit. taskbarDragBetweenRows moves a task to
another row.
The dialog has General, Dependency, Resources, Notes and Segments tabs, or the
tabs of editing.dialogTabs (custom tabs render your content). Methods:
addTask(task, { position, targetId }), updateTask, deleteTasks,
changeTaskId, indent, outdent, moveTasks, addDependency,
removeDependency, updateDependencies, splitTask, mergeSegments,
convertToMilestone, convertToTask, setTaskMode, openAddDialog,
openEditDialog. undo (true or { actions, limit }) records every
change: api.undo(), api.redo(), getUndoActions(), getRedoActions(),
clearUndo(), clearRedo(), Ctrl+Z and Ctrl+Y.
toolbar lists 'add', 'edit', 'update', 'delete', 'cancel',
'expandAll', 'collapseAll', 'search', 'previousTimeSpan',
'nextTimeSpan', 'zoomIn', 'zoomOut', 'zoomToFit', 'indent',
'outdent', 'criticalPath', 'excelExport', 'csvExport', 'pdfExport',
'undo', 'redo' and custom items (onToolbarItemClick). contextMenu
adds 'taskInformation', 'deleteTask', 'addAbove', 'addBelow',
'addChild', 'addMilestone', 'convertToTask', 'convertToMilestone',
'deleteDependency', 'indent', 'outdent', 'splitTask' and
'mergeTask' to the Data Grid items, in both panes.
Gantt editing and undo
Open demoA website relaunch plan edited in grid cells, in a task dialog with a custom Owner tab and by dragging taskbars, their ends, progress and connector points, with add, delete, indent, milestones, dependency methods, undo and redo, the toolbar, read-only mode and chart events.
Pointer: move over the chart
- Drag a taskbar or edit a cell
Resources
resources with resourceFields (id, name, unit, group) and the task
resources role ({ id, unit }[]) assign people; the resources column and
dialog tab show them.
resourceView groups the rows by resource: one parent row per resource (in
resources order) with its tasks, then an "Unassigned" row. A task with two
resources is listed under each; the second listing has the grid row key
taskId@resourceId, resource rows __res:<resourceId>, and every method still
takes task ids. overAllocation marks where a resource's summed units exceed
its unit (default 100 %): data-part="overAllocation" ranges in the
resource row and data-over-allocated on the bars inside them.
multiTaskbar draws a collapsed parent's children in its row and a
resource's tasks in the resource row; with taskbarOverlap={false}
overlapping bars stack in lanes and the row grows in both panes. With
editing={{ taskbarDragBetweenRows: true }} dropping a bar on another
resource's row moves the assignment there (on the Unassigned row it removes
it); in the project view the task moves below the target row, or into it when
the target is a parent.
<Gantt data={tasks} resources={people} resourceView overAllocation multiTaskbar taskbarOverlap={false} editing={{ taskbarDragBetweenRows: true }} />
Gantt resources and split tasks
Open demoPeople assigned with units, the resource view with an Unassigned row, over-allocated ranges, overlapping bars stacked in lanes, multi-taskbar rows, a task split into segments with split and merge, and taskbar drags that reassign people.
Drag a bar onto another person, or right-click a bar to split it
Tooltips
tooltip (or { renderTaskbar, renderBaseline, renderConnector }) opens one
Tooltip on hovered or focused taskbars, milestones, baselines and
connectors with the title, dates, duration and progress;
onBeforeTooltipOpen can cancel it. It is a lazy chunk; import
@salmonui/overlays/tooltip/styles.css with it. Drags show their own editing
tip with the new dates.
Export, print and state
api.exportToExcel() and api.exportToCsv() are the grid pane's exports
(tree rows as outline levels, with the Data Grid cell and headerCell
hooks); api.exportToPdf(options) draws both panes as
PDF vectors through exportWriters.pdf, a dynamic import of
@salmonui/export/gantt (pageSize, orientation, fitToWidth,
header, footer, font, and the cell, headerCell, taskbar,
timelineCell hooks). api.print() prints the rendered panes.
api.getState() / api.restoreState() hold the grid state, splitter, zoom and
scroll date; there is no built-in persistence.
Keyboard and accessibility
The grid pane is the Data Grid treegrid with its keyboard model. Gantt keys:
Alt+Shift+Right / Left indent and outdent, Ctrl+Z / Ctrl+Y undo and redo, F6
moves focus between the panes. In the chart pane, Up / Down select the
previous / next task, Left / Right scroll the timeline (Ctrl: a page), Enter
opens the dialog and Ctrl+Plus / Ctrl+Minus zoom. Each taskbar is labelled
with its name, dates, progress, dependencies and critical state, and the grid
row is described by it. dir="rtl" runs the timeline right to left.
Gantt export, keyboard and languages
Open demoExcel, CSV and vector PDF export through lazily loaded writers, print, the default context menu, the keyboard model and labelled taskbars, German strings, Arabic right to left, the adaptive one-pane layout and the task lookup methods.
Export, right-click a row or a bar, or press F6 to move between the panes
Splitter and panes
splitter (position, columnIndex, minSize) and panes
('both', 'grid', 'chart') place the panes on the public Splitter;
api.setSplitterPosition(), onSplitterResizeStart, onSplitterResize
(once per frame) and onSplitterResizeEnd report resizing.
Adaptive layout
adaptive shows one pane at a time with a
"Tasks | Timeline" switch (localeText.gridPane, localeText.chart, group
label localeText.paneSwitch) and opens the task dialog full screen.
adaptive (true) is always adaptive, server markup included;
adaptive={{ breakpoint: 640 }} follows the Gantt's own width (a
ResizeObserver, so the server and hydration render both panes and the switch
appears after mount below the breakpoint). The task list stays mounted while
the timeline shows, so selection, scroll and expansion survive the switch.
<Gantt data={tasks} adaptive={{ breakpoint: 720 }} timeZone="UTC" />
Server rendering
With timeZone set, both panes render the grid's initial rows and the first
timeline window on the server with no today marker, and hydrate without
warnings.
Large Gantt projects
Open demoA deterministic 5,000-task project with chained dependencies, rows and timeline cells virtualized in both panes, server-rendered initial rows, a timed critical path toggle, a reschedule of every successor and a scroll to the last task.
5,000 tasks; scroll both panes
State, lifecycle and events
- State. Components never write to browser storage.
api.getState()returns{ grid, splitter, zoom, scrollDate }, covering the Data Grid state, splitter position, zoom level and scroll date, andapi.restoreState(state)applies it; store the snapshot yourself. - Data updates. Tasks have stable ids and the engine updates
rows incrementally by id on every data change, so there is no immutable
mode. A new
dataarray with the same task ids keeps row DOM, expansion, selection and scroll, and only changed tasks re-render. - Templates. Customize with
renderTaskbar,renderBaselineand the other render props. There are no HTML string templates; text from data is always escaped. - Agent tools. Register your own tools over
GanttApimethods such asaddTask,updateTask,addDependencyandgetCriticalTasks, with your own confirmation step; components do not register WebMCP tools. - Lifecycle.
onReady(api)fires after the first commit; props are declarative, and unmounting tears everything down. - Action events.
onBeforeTaskChange,onBeforeTaskbarEditEnd,onBeforeDependencyChange, the Data Grid pairs in the grid pane, andonError({ error, action, taskIds })for failures;event.preventDefault()cancels.
API reference
The API reference for @salmonui/gantt
lists every prop, method and type.